Systems Engineering & Project Risk

Systems Engineering & Project Risk Risk always finds itself as a key talking point among all projects; how can you quantify it accurately, and more importantly, how can you limit it? There’s no plot twist here, the answer is systems engineering. By investing more time and resources into early design and pre-design phases, we can […]

Control Centre Communications Review

Control Centre Communications Review Layer 2 Intelligence was engaged by a major NSW Public Safety agency to conduct an in-depth review of their Control Centre Communication Systems (including the call recording systems) and provide reports documenting their status and recommended roadmap for upgrade. The deliverables from this analysis will be used by the agency to […]

Aurizon – Wayside Condition Monitoring Support

Aurizon – Wayside Condition Monitoring Support L2iQ is proud of their ongoing involvement with the Operations and Maintenance of the Aurizon owned, Trimble Beenavision condition monitoring equipment located at Branxton in the Hunter Valley. This system is used extensively by Aurizon throughout Australia, including the Hunter Valley, to monitor the condition of their rollingstock fleet. […]

V/Line OCMS Review

V/Line OCMS Review Earlier this year, Layer 2 Intelligence was invited by V/Line to undertake a strategic review of their Operations Control Management System (OCMS) asset class which included: Train Control systems, Backhaul communications systems, Wireless communications, Level Crossing Monitors, Security, and Passenger Information. L2iQ undertook a detailed review of the current state of each […]

ARTC TAR Corridor Maintenance

ARTC TAR Corridor Maintenance L2iQ are pleased to have supported Australian Rail Track Corporation (ARTC) once again with the maintenance of their communication sites in the TAR corridor. ARTC facilitates vital transport supply chain with a rail network that stretches across the Australian mainland. While on site at some of the most scenic locations that […]

NorthConnex Tunnel

NorthConnex Tunnel NorthConnex tunnel project provides the long-awaited link between the M1 Pacific Motorway and the Hills M2 Motorway in Sydney, Australia. Delivered by Transurban and the M7 Shareholders, the tunnel constructed by the Lendlease and Bouygues joint venture (LLBJV) officially opened on the 31st of October 2020. Layer 2 Intelligence and our partners SYSTRA […]

Private Mobile Radio Base Station Refresh

Private Mobile Radio Base Station Refresh L2iQ recently provided assistance to a major NSW Public Safety agency by developing the technical specification for their Private Mobile Radio (PMR) base station refresh program. Since the Public Safety Network (PSN, previously GRN) does not provide 100% coverage to all areas of the state, our Client operates and […]

Transurb Simulator Installation

Transurb Simulator Installation A new partnership between Transurb and Layer 2 Intelligence has given L2iQ the opportunity to deliver the installation, configuration and testing/commissioning of driver training simulators for Sydney Trains. These simulators are used in the earlier stages of train driver training to give drivers the opportunity to gain familiarity with desk layouts, routes […]

ARTC Communications Site Maintenance

ARTC Communications Site Maintenance L2iQ recently undertook maintenance of communications sites on behalf of ARTC in the SIA and TAR corridors. For the SIA corridor, a total of twenty-nine sites between Port Botany in South-eastern Sydney, Wagga Wagga in the Riverina region of NSW and Dubbo in the Orana region of NSW were attended. In […]